Port Commissioners will be voting on the Proposed TIA on December 9

information released, photo: looking across the Columbia River to Malaga, from Circle 5 Winery (Martin-Scott)

The Revised Code of Washington (RCW) requires jurisdictions considering the establishment of a tax increment area (TIA) to submit a project analysis report to the Office of the State Treasurer (OST) for review. The Port of Chelan County (Port) submitted the report for the proposed Malaga TIA on August 20, 2025. OST completed their review and provided comments to the Port on November 13, 2025.

Per the RCW, the Port of Chelan County must review and consider any comments provided by OST. The role of OST defined in RCW is purely advisory and does not constitute an act of approval. Similarly, the OST review process does not provide an overarching conclusion or opinion on whether or not the State supports or opposes any particular TIA. OST review, and the Port’s response will supplement the Project Analysis Report and will be included in the record the Port Commission considers in connection with its December 9, 2025, resolution establishing the Malaga Tax Increment Area.

The State’s review included six recommendations for the Port to consider, which is consistent with the other 25 reviews previously completed by OST for other jurisdictions establishing TIAs across the state. On average, each OST review includes six recommendations for the sponsoring jurisdiction to consider. Of the six recommendations for the proposed Malaga TIA, four are considered standard recommendations that OST includes on nearly all of the reviews they have completed, and two are more specific to the details of the proposed Malaga TIA. These recommendations relate to the “but for” argument, which has only been a standard section of OST review documents for the seven most recently completed reviews.

The OST review is included on the Port’s website at https://www.cdrpa.org/pocc-tif-district as is the Port’s response to the six recommendations.

The Port of Chelan County is hosting two more public briefings relative to the proposed Malaga TIA, including:

• November 24th, 2025, at 5:00 p.m. at the Confluence Technology Center.

Those wishing to join by Zoom may use this link: https://us02web.zoom.us/j/88903058793?pwd=5rz8CnJ7YXC75FXg54lLYnWwu70QXB. 1

• November 25th, 2025, at 5:00 p.m. at the Confluence Technology Center.

Those wishing to join by Zoom may use this link: https://us02web.zoom.us/j/81914928935?pwd=dBr4ADaej9MRZ9sI77bjHgU7wmOtxm.1

The Port of Chelan County Commissioners will vote on the proposed Malaga TIA on December 9.

A Tax Increment Area (TIA) is a designated geography where the future increase in property tax revenue generated by future growth is used to finance prioritized public improvements. It is a way to generate necessary funding from the companies moving into the TIA to support the growth. A total of 3,326 acres is Malaga have been designated as a TIA, with funding generated to allow for $220M to support residential and commercial infrastructure and safety investments through Tax Increment Financing (TIF).

Tax Increment Financing (TIF) was first outlined as statute in RCW 39.114 in 2021 as a way for designated TIAs to fund infrastructure necessary for growth by using property taxes generated by that future growth. The new infrastructure attracts development, which then pays for the cost of the public improvements and infrastructure. Malaga is a historically underserved community within Chelan County. Malaga is growing and current infrastructure is not capable of meeting future demand. Existing funding to support growth is limited or non-existent in other budgets.

Projects designated to receive funding have been outlined with input from partners such as the Chelan County Commissioners and taken from:

  • Chelan County Comprehensive Plan (2017-2037)
  • Malaga Vision Plan (2017)
  • Our Valley Our Future Action Plan: 2022-2026

The full project list includes: Safety Projects (8):

  • Stemilt Creek Bridge improvements
  • Alcoa Highway safety improvements
  • Malaga Alcoa Highway overlay & repairs
  • Malaga -Alcoa/ Stemilt Creek intersection improvements
  • W. Malaga Rd safety improvements
  • Malaga-Alcoa Highway capacity improvements
  • General Road Improvement projects
  • Saturday Ave pedestrian improvements

Access Projects (3):

  • Malaga Columbia River Crossing (Third Bridge)- location and size study
  • Malaga Columbia River Crossing (Third Bridge)- land acquisition and right of ways
  • Malaga to Wenatchee bike/pedestrian pathway

Economic Development (12):

  • Sewer transmission lines
  • Industrial cooling water system expansion
  • Water utility systems
  • Water transmission lines
  • Rehabilitate existing rail lines
  • Add additional rail capacity
  • Infrastructure to support rail car loading and off-loading
  • Electrical improvements to serve data centers & other large-load electrical utility customers
  • Upgrade existing natural gas lines
  • Add additional natural gas transmission line capacity
  • Electrical improvements to serve data centers & large-load electrical utility customers
  • Industrial symbiosis projects

Community Development (5):

  • Malaga Columbia River Park
  • Malaga to Wenatchee bike/pedestrian pathway
  • Renovation /expansion of existing Wenatchee Valley Fire Department station in Malaga
  • Malaga daycare facility
  • Law Enforcement shooting range/training facility

The full list of projects can be found here.

The Chelan Douglas Regional Port Authority is the economic development leader throughout Chelan and Douglas Counties, focused on building a thriving economy with prosperous and sustainable growth for our neighbors, communities, and region today and in the future. We use data to promote investments, develop infrastructure to support businesses and communities, and facilitate initiatives that deliver measurable economic benefits for shared prosperity.