Lane closure scheduled for Sunday on SR 285 George Sellar Bridge
Information released by WSDOT
A Washington State Department of Transportation inspection team will perform a regularly scheduled bridge inspection of the SR 285/George Sellar Bridge linking Wenatchee and East Wenatchee on Sunday, September 20.
The bridge inspection will require the closure of the outside eastbound lane of the bridge starting at 4:30 a.m. The inspection work will begin at 6 a.m. and scheduled to be complete by 12 p.m. This will be the only lane closure necessary for the inspection. No travel delays are expected, but motorists should be attentive for the lane closure and the inspection crew on the bridge Sunday morning.
Any changes to the work will be shared on the travel alert page and on Twitter @WSDOT_East.
WSDOT keeps people, businesses and the economy moving by operating and improving the state’s transportation systems. To learn more about what we’re doing, go to www.wsdot.wa.gov/news for pictures, videos, news and blogs. Real time traffic information is available at wsdot.com/traffic or by dialing 511.